Sewer Line Flushing in Stayner - Between September 13 and September 30, 2010 between the hours of 7am and 4:30pm.
 

Road Closure - 27/28 Sideroad from Highway 26 to County Road 7 will be open to local and emergency traffic only from May 31 to September 30, 2010

 

Road Closure - 33/34 Sideroad from County Road 124 to Concession 6 North will be open to local and emergency traffic only from May 1, 2010 to the end of September 2010.
 
PDF Print E-mail

WATER AND SEWER 


DRINKING WATER QUALITY MANAGEMENT SYSTEM POLICY STATEMENT

It is Clearview Township's aim to ensure safe drinking water to the end user within all Township - operated Water Systems. Through this policy, the Township commits to follow all applicable Legislation & Regulations that are associated with the safety and the delivery of Drinking Water. Through maintenance and continual improvement to the Quality Management System the Township is identifying, measuring, controlling and improving the various core water works processes that will ultimately lead to improved water works performance.


SEWER LINE MAINTENANCE IN STAYNER

The Water/Sewer Department will be overseeing sanitary sewer line flushing as shown on the notice below between September 13, 2010 and September 30, 2010 between the hours of 7:00 a.m. and 4:30 p.m.

Notice of Sewer Line Maintenance in Stayner


BILLING & PAYMENT INFORMATION 

For general inquiries regarding Water & Sewer billing or rates, please contact our Billing Clerk at: (705) 428-6230 Ext. 235 during office hours between 8:30 am to 4:30 pm.

For your convenience, we now offer pre-authorized payments for your water/sewer billing. Please the Pre-Authorized Payments to access these forms.


WATER BY-LAWS


QUALITY MANAGEMENT SYSTEMS

Congratulations to the Clearview Water Department! On May 25, 2010, the Township of Clearview received Full Accreditation certificates by the Canadian General Standards Board for successfully implementing Quality Management Systems for municipal water systems in:

- Buckingham Woods
- Nottawa
- Collingwoodlands
- New Lowell
-
Creemore
- Stayner

List of CGSB Registered Companies 


CREEMORE SEWAGE TREATMENT PLAN NEW EQUALIZATION TANK

On October 28th, 2009 the Township of Clearview held a Public Information Centre on the Environmental Assessment for the Creemore Sewage Treatment Plant New Equalization Tank. To see the slides, please click here.


SEWAGE COLLECTION & TREATMENT ENVIRONMENTAL ASSESSMENTS (EA) (LONG TERM)

The Township of Clearview has published a Municipal Class Environmental Assessment for Long Term Sewage Collection & Treatment. To view the Environmental Assessments, please choose one of the links below:


2009 WATER AND SEWER RATE STUDY


2009 LEAD TESTING

The Township of Clearview Water and Sewer Department is requesting volunteers to be part of the 2009 Lead Sampling Program.  This program is in compliance with Provincial Legislation and will provide a more detailed review of lead levels at the tap.  Our ongoing sampling program in 2007 and 2008 did not identified problems with lead in our water.

For information on Lead Testing in Clearview Township, please review the following documents...

Lead Testing Bill Stuffer 
Lead Testing Regultation 
Lead Testing Special Note

For more information on Lead and Drinking Water, please visit the Ministry of the Environment Website at:
http://www.ene.gov.on.ca/en/water/tapwater/index.php 



BLOCKED SEWER SERVICE LINE

To avoid risk to you, your employees and others, before cleaning a blocked sewer service line beyond the outside wall of your building Ontario One Call at 1-800-400-2255.  For further information, please view the Enbridge Gas Distribution Brochure



2009 WATER SYSTEM ANNUAL REPORTS

2009 Summary 


DOOR TO DOOR WATER TESTING

In the last few weeks, we have received many phone calls from residents inquiring about door-to-door sales people offering free drinking water tests. Some residents were confused about the tests and wondered if these people worked for the Township. For more information on water testing in Clearview, please click here.

 

PRIVATE WELL OWNERS

Putting your well water to the test.  http://www.health.gov.on.ca/english/public/pub/watersafe/watersafe_welltest.html 


REPORTS

2007 Annual Reports
 - Stayner 
 - Creemore 
 - New Lowell 
 - Buckingham Woods 
 - McKean 
 - Collingwoodlands 

2006 Annual Reports
 - 2006 Annual Summary Report (Residential Water Systems)
 - Stayner 
 - Creemore 
 - New Lowell 
 - Buckingham Woods 
 - McKean 
 - Collingwoodlands 



SUSTAINABLE WATER AND SEWER RATES 

1.  Clearview Water & Wastewater Rate Project Final Report
Completed by Sharrett Water Managment Ltd, the executive summary (first 3 pages of the report) outlines the recommended rates as a result of the study done under Bill 175 - the Sustainable Water and Sewage Systems Act, 2002.  The balance of the report provides background information supporting the recommendations.

2.  Estimates of Replacement Costs for Water & Sewer Infrastructure 
Completed by R.J. Burnside and Associates Ltd, this is a summary of the extensive work completed to inventory the existing infrastructure assets, establish a replacement cost for each asset and identify anticipated replacement dates for each asset.

3.  Notice to Landlords / Common Q & A
Outlines how the new rates and rate structure will impact the billing of tenant occupied properties especially after July 1, 2007.


For further information contact, please contact
 Edward Henley, Treasurer.



LINKS OF INTEREST

 

Last Updated ( Monday, 30 August 2010 )
 
   
 

 
Fall/Winter Rec Guide
Click on the image above
to view the online version
of the guide
 
  Putting Culture on the Map
 
September 2010
M T W T F S S
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 1 2 3
October 2010
M T W T F S S
27 28 29 30 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31